REHAB AND REMODELING COSTS FOR THE 4,800 SQ FT BUILDING REQUIRING REHAB AND REMODEL ON LOTS 15 & 16 AND LOT 7 IN BLOCK 33, PLAT 5 EAGLE BAY SUBDIVISION

            Remodel Construction Cost Estimate PHASE I Eagle Bay

Large Lake House Remodel 28336 Paperwood Drive


4800 Sq ft Lake Home - Foundation: Slab on Grade - Location: 78 mile marker of Lake of the Ozarks in Benton County, MO


As Finished Version: 4 Bdrm 3 ba  2-story


Garage:  (current 1 car) Planned Addition of an attached 2-door (1- 10 ft & 1- 14 ft) RV Garage (Shouse) to enhance value of appraisal                           


INDIRECT CONSTRUCTION COSTS


COST

NOTES

Bldg Permits/Fees

$0.00

Sewer Tap N/A Impact Fee N/A

Benton County Permit 

Attorney Fee

      0.00


Architect Plans and Specs

  1,493

Blue Print Copies

Structural Engineering

      400


Wastewater Treatment Inspection 

      250


Construction Insurance

      1,850


Supervision/Overhead

11,000

Boulevard Construction

Temporary Power

    0.00


Water Well Inspection

      200


TOTAL

15,193



EXCAVATION/SITE WORK

Foundation Pad Const.

Included 


Finish Grading

Included


Backfill

Included


Wastewater Treatment

5,000


Electric Trench

Included


Drain Tile and Gravel

N/A


Rock Removal

N/A


Misc. Hauling

N/A


Grinder Pump

Included


TOTAL

0.00




INTERIOR CARPENTRY

Interior Framing Lumber Material

4,559





Interior Framing Labor

4,674


Crane Service

N/A


Windows & Screens

1,926


Skylights

N/A


Exterior Doors

Included


Garage Doors

N/A


Garage Openers

N/A


Deck, Porch Labor

N/A


Deck, Porch Materials

N/A


Steel Beams and Posts

N/A


Vinyl Siding

N/A


TOTAL

11,159



PLUMBING

Ground Rough

N/A


Rough Plumbing

2,126


Finish

  895


Fixtures

Included


Other

N/A


TOTAL

3,021



HVAC

Rough In

3,892


Finish

1,239


Other

N/A


TOTAL

5,131



ELECTRICAL

Rough Electrical

  821


Finish Electrical

  568


Fixtures

1,106


Other

N/A


TOTAL

2,495



INSULATION

Firestopping

N/A


Wall & Attic Insulation

N/A


Other

N/A


TOTAL

N/A



DRYWALL

Drywall Materials & Labor

4,121


Other

N/A


TOTAL

4,121



FINISH CARPENTRY

Trim Material

1,200


Interior Doors & Exterior

Included in Trim Material


Moldings/stair rail/columns

N/A


Finish Carpentry

1,156


Fireplace Equipment

0.00


Hearth and Mantel

N/A


Closet Organizers

Included in Trim Material


Finish Hardware

1,022


Spindles

N/A


Other

N/A


TOTAL

3,378




PAINTING

Interior Painting

3,817


Exterior Painting 

N/A


Other

N/A


TOTAL

3,817



FLOORING

Floor Tile Material

N/A


Floor Tile Labor

N/A


Carpet Material

8,701


Carpet Labor

Included


Hardwood Floor Material

N/A


Hardwood Floor Labor

N/A


Viny Flooring&Labor

2,800


TOTAL

11,501



MIRRORS AND GLASS

Shower Doors

920


Mirrors

760


TOTAL

1,680



LANDSCAPING

Fill and Topsoil

N/A


Nature Landscaping

1,000


Plant Materials

  700


Plant Materials Labor

  300


TOTAL

2,000



CABINET, COUNTER AND APPLIANCE

Kitchen Cabinets

2,981


Vanity Cabinets

Included


Kitchen Tops

1,560


Vanity Tops

390


Kitchen Appliances

4,200


TOTAL

9,131



MISCELLANEOUS

Silt Fence

N/A


Mail Collection Box

N/A


Final Cleaning

500


Construction Cleanup

500



 


TOTAL

1,000



TOTAL COST OF CONSTRUCTION

LOAN COSTS

  TBD


CURRENT LOANS

NO LOANS

REMODEL COST:    

$78,758 Total LoanReplacement Value  $624,000

Value before Remodel


Value After Remodel


Sell in 90 days TOTAL



$480,000 (incl. two lots)


$600,000 (incl two lots)


$500,000





Estimated Cost Total Rehab of Eagle Bay Original House on Lot 7

 Current 400 sq ft  When Finished  550 sq ft (full bath & office additions)



Description

Scheduled Cost



Actual Cost

Sub

Closing Costs

N/A



TBD

Pinnacle

Attorney Fee

0.00



TBD

Elizabeth Marr

Insurance

  700



TBD

Turner

Architect

  500



TBD

Gerald Ford

Survey/Engineer

  500.



TBD

Borden/Sullivan

Permits

  0.00



N/A


Excavation

  200.00



TBD

SLS & Blvd

Gravel

  300.00



TBD

Barber & Sons

Footings/Foundation

  700 (bathroom)



TBD

Strate & SLS

Concrete

  500.



TBD

Whistle

Lumber

5,000



TBD

McCray & Owen

Rough In

3,000



TBD

John Palomo

Windows

1,300



TBD

McCray

Roofing

4,800



TBD

Owensby

Plumbing Rough In

3,500



TBD

Strate

Electrical Rough In

1,500



TBD

Jess & Moyer

HVAC

4,000



TBD

Comfort Systems

Insulation

  800



TBD

Owen

Drywall

4,600



TBD

Boulevard

Trim/Millwork

2,000



TBD

McCray

Cabinets/Tops

2,500



TBD

McCray

Garage Door

0.00



0.00

Roll Rite

Finish Carpentry

  800



TBD


Painting

1,200



TBD


Siding

3,700



TBD

Heartland Stucco

Flooring

2,400



TBD


Gutters

  500



TBD

James Stewart

First Clean

  280





Electrical Finish

2,000



  TBD


Hardware

  392



  TBD


Shower/Mirrors

  500





Vanity Tops

  500





Appliances

2,000





Final Grade

  200





Landscaping

  500





Final Clean

  250




Blvd

Lot Cost

Misc 

  0.00



0.00

/ORI













Utilities

500




West Central

Temporary Power

275




West Central

Interest

3000




Pinnacle

Supervision/Overhead

4,000




Blvd

Total

57,000